Tuesday, January 11

Winter work continues

As the snow is flying, the staff is still busy working on our equipment.  Right now, the Toro equipment is in the shop getting new hoses, bearings, bedknifes, and will soon be sent to the other end of the shop to be ground, sharpened, and backlapped.

I have two posts today, and I realize that people like the pictures, but below this post and pics is a major legislative victory for people in my line of work.  Check it out!

The underside of a reel with the bedknife removed.  All the bearings will be replaced in the rollers and reels, a new bedknife will be installed, and the unit will be trued and sharpened.

One of our older tee mowers getting some new hydraulic lines to prevent leaks (hopefully!)


Dave adjusting a fresh bedknife to the reel.


Meanwhile, all course benches are being disassembled.

Our homemade bench supports get scraped and painted.

All bench slats getting a fresh coat of paint and being replaced as needed.

No comments:

Post a Comment